When we were thinking of a topic for this issue of our Operational Excellence Newsletter, I had just completed a conversation with the maintenance manager of an electronics firm who was interested in getting a Total Productive Maintenance (TPM) program started at his facility. He asked if I could provide him with some information on stakeholder roles in a TPM effort to help him “sell” the program internally.
It is not an uncommon question from those considering Total Productive Maintenance (TPM) so I thought it would be a great topic for our newsletter.
TPM Stakeholder Roles and Responsibilities; Creating a Partnership Between Production, Maintenance, Engineering and Leadership.
Although there are still misconceptions, I am happy to see more and more organizations understand that TPM is not simply a maintenance department program, but an effort that encompasses the entire organization. What is still often overlooked, however, is that TPM is as much (if not more) of a social program than a technical one.
People are often surprised by this, but when you consider that Total Productive Maintenance (TPM) breaks the barriers between production, maintenance, engineering and quality and puts everyone on the same team, it is easier to see the social implications. Imagine a workplace void of the typical adversarial relationships where blame-placing and finger pointing are a thing of the past.
The Total Productive Maintenance (TPM) environment is based on cooperation, collaboration and communication. These of 3C’s, as we call them, add up to one very powerful partnership. So what role do the stakeholders play in the TPM effort? Here’s a quick summary for each:
Production Process Owners—Lean for Implementing Autonomous Administrative Maintenance (AM) Processes
In a TPM environment the process owners’ role is to prevent or control deterioration. This is accomplished by having process owners take responsibility for the routine maintenance of the production equipment thus eliminating the days of “I operate it/you fix it”. Activities performed include cleaning, inspecting, lubricating and establishing provisional standards for each.
As the initial steps of Autonomous Maintenance become routine, skill development and training sessions between process owners and maintenance techs are established to teach them about machine subsystems so they can take over routine maintenance of these systems. Over time, these activities become part of the production process owners’ daily work.
Maintenance—Implementing Maintenance Improvement (MI)
With the basic Autonomous Maintenance routines established and being carried out by the process owners, maintenance technicians focus on planned, preventive and predictive maintenance, and stores management. They spend time nurturing and enhancing production process ownership and, as noted above, teach process owners the routine maintenance operations for all machine sub-systems, which is the next step in the AM process. As the Total Productive Maintenance (TPM) effort continues to mature, they will also work with quality and engineering on zero defects and design for maintainability projects as well as new equipment purchase/install initiatives.
Concurrent with the Autonomous Maintenance and Maintenance Improvement efforts, production process owners and maintenance techs also work in partnership to understand and correct chronic losses/issues (thru Focused Improvement) and then apply the lessons learned to new equipment design and build as well as existing equipment redesign and rebuild (thru Early Equipment Management and Maintenance Prevention Design).
Quality—Implementing Quality Maintenance (QM)
With the first 4 TPM Pillars (Autonomous Maintenance, Maintenance Improvement, Focused Improvement and Training and Skills Development) in place and taking hold, the TPM effort begins to focus on Quality Maintenance and achieving zero defects. Like safety, quality is everyone’s responsibility. In the TPM environment, it is understood that the key to zero defects resides closest to where the product is being made.
As such, quality managers, engineers, maintenance techs and process owners work together to analyze defects so steps can be taken to eliminate the defect from reoccurring. Machine modifications are constructed ensuring equipment is able to detect and prevent errors. The quality maintenance pillar also instills in the workforce the importance of finding the root-cause of a problem, a skill taught as part of the Training and Skill Development Pillar. It is well documented that Toyota has created a “community of scientists” by developing a culture of problem-solvers!
Engineering—Implementing Early Equipment Management (EEM),
Maintenance Prevention Design (MPD) and supporting AM and MI Efforts
Throughout the Total Productive Maintenance (TPM) implementation, engineering plays a key role. From working with production process owners to make machine modifications that enable easy cleaning and inspection to working with quality and maintenance on modifications to eliminate quality defects, it is the role of engineering to ensure machine standards evolve to support the effort.
Using the experience gathered from these efforts, engineering also works with various stakeholders to ensure that new equipment goes into production in a “TPM state of readiness” thus ensuring optimal performance is reached earlier than is ‘normal’ and quality output is achieved from the first production day.
It is important to note that in a TPM environment, it is not exclusively the engineer’s role to solve problems or make improvements but to partner (talk/listen) to process owners and maintenance techs on what’s needed to improve equipment and process function and maintainability and to turn those ideas into realities. To make this happen, engineers should spend approximately 50% of their time in the workplace.
Leadership—Supporting the Effort
Leaders at every level in the organization—from first line supervisors to plant management -have a role to play in a Total Productive Maintenance (TPM) environment. It is leadership’s responsibility to support, embrace and engage all stakeholders in the TPM effort. To accomplish this, a series of nested coaching sessions is created that will ensure the effort is tied to organizational goals, is continually moving forward and is sustainable. A brief outline of the various leadership roles is noted below:
Sets improvement objectives and expectations and the associated time tables for achieving each objective
Develops a communication process to communicate objectives to his/her direct reports
Establishes leader standard work routines relative to TPM and incorporates them into existing leader standard work practices
Develops Gemba Walk routines based on monthly themes
Reviews and refreshes objectives (semi-annually)
Ensures understanding of senior leadership’s objectives
Translates each objective into action items/targets to improve (TTI’s) for their departments with clear expectations and timetables
Develops a procedure to communicate objectives/TTI’s and timetables to their direct reports
Establishes their leader standard work practices
Develops Gemba Walk routines based on weekly themes
Assists in the development and cascading of objectives for their direct reports and provides continual feedback on progress of TTIs to Senior Leaders.
Ensures understanding of manager’s TTI’s
Translates TTIs into action items for their associates to include clear expectations and ensure timetables
Develops a procedure to communicate TTIs and timetables to the associates and provides continual feedback on progress of TTI’s to Managers
Establish their leader standard work practices
Continues to develop skills in Autonomous Maintenance (their own and their direct reports)
Develops Gemba Walk routines based on daily themes
So, there you have it…a brief overview of the roles and responsibilities of the various stakeholders in a Total Productive Maintenance (TPM) environment. One footnote…in this article I did not talk about Office TPM or the role your administrative personnel play in the effort. I will leave that for a future article.
While it can take time (3-5 years) to implement, TPM delivers immediate returns. It eliminates equipment and process reliability issues. It improves safety. It increases capacity. It removes barriers between production, maintenance, quality and engineering. It connects organizational objectives to daily work. And, TPM is not ‘extra’ work, but the way you work. TPM is my passion. If you are passionate about TPM too, I’d love to hear your success stories. Drop me a note and we’ll share perspectives.
ASK THE CONSULTANTS
Roles and Responsibilities within a TPM environment is a hot topic. We received the question below from a reader and chose to include it in this issue because it relates so well to the feature article. In our response below, we build from the information in the feature and we expound on the role of Quality in TPM.
The 3-Legged Stool
Within best-in-class TPM deployments, a Daily Management System (sometimes known as Daily Direction Setting) is owned and led by an Area Leadership Team consisting of (i) an Operations Leader, (ii) a Maintenance Leader and (iii) a Process Leader; this teaming is often referred to as the 3-Legged Stool. The role of the Operations and Maintenance Leaders ensures a direct line of accountability to the operators and technicians as standard work is created and deployed. The Process Leader owns loss analytics and always ensures top losses are well understood and being worked on. There is no reason why a quality engineer cannot be the “Process lead” on this team. In fact, I have seen many such examples, where quality losses are high and SPC / In-Process Control methods are required, the best person to lead this effort is a person from the Quality Department.
Drivers for Quality Improvement
Some common examples of In-Process Quality Metrics: Weight, Dimensions, Color, Packaging Quality, First Pass Yield, Waste, Rework, Overweight, Temperature, Pressure etc. Once a relevant quality metric is identified for improvement by the Area Leadership Team, then there are 2 levers that will drive quality improvement.
Improvement through Daily Management: The Daily Management System ensures this metric is tracked every shift. A root cause analysis is conducted to determine the cause of the problem, then corrective actions are put in place and improvements made.
Improvements in OEE improve quality: In parallel, TPM ensures reduction in minor stops and breakdowns. Equipment with a fewer number of stops and breakdowns will generate a higher quality product while waste and rework are greatly reduced. OEE improvements also lead to improved Safety as a result of uninterrupted operation!
Bottom line in a TPM organization, quality improvement is seamlessly and proactively integrated into operations through an effective Daily Management System that puts a quality engineer on the improvement front lines and keeps a laser focus on the in-process quality metrics that matter most.
Source: Productivity Inc